The Design-Build Difference
Six disciplines. One signature on every drawing.
Most homes change hands half a dozen times before ground is broken —
architect to engineer, engineer to drafter, drafter to a permit runner, and finally to a
builder seeing the plans for the first time. Every hand-off is where budgets leak,
details get lost, and fingers start pointing. We removed the hand-offs.
Step 01
Architecture
Massing, floor plans, and elevations shaped around your lot, your light, and your city's zoning code.
Step 02
Interior Design
Kitchens, baths, and millwork designed with the floor plan — not decorated onto it afterward.
Step 03
Structural
Foundations and framing calculated and stamped in-house by our own licensed PE.
Step 04
MEP
Mechanical, electrical, and plumbing routed as one coordinated set, Title 24 included.
Step 05
Permitting
We submit, answer corrections, and pull the permit ourselves — in the cities we work in every week.
Step 06
Construction
Our licensed GC crews build the exact set we drew, with the engineer of record walking the site.
When the person who stamps your structural drawings is the person
who frames your walls, nothing gets lost in translation — and there is
exactly one phone number to call when you have a question.